Power Audit
OBJECTIVE:
To conduct electrical and power quality audit to check the input power quality and dimensioning of the AC / DC power system along with the quality of the workmanship, to ensure a clean and trouble-free uninterrupted AC / DC power to the critical telecom equipments.
&
OPEX savings’ observations & recommendations to the Employer.
The activities of the audit can be classified for the following:
· INPUT POWER
· INPUT TRANSFORMER & LT PANEL
· D.G, AMF & CHANG
· Electrical Installation
· Earthing and Equipotential Bonding
· Fire Safety
· Fire Extinguisher
· Water Back-up arrangement
· Miscellaneous
· Lightening Protection
· Air conditioning
· False flooring
Power Audit:-
· AC Distribution Panel
· Power Plant
· Battery Banks
· Battery Banks
· DC Distribution Panel
· UPS